Bridge 35

The project consists of replacing the existing structure with a three span, cast-in-place concrete slab bridge. The new bridge will be designed with an increased overall span length to provide 2:1 embankment side slopes. C.R. 59 will be widened 500-feet on both sides of the bridge to allow for adequate shoulders and all guardrail within the project will be redesigned and replaced. A&Z is teaming with Engineering Resources Inc. to complete the bridge design.