
A&Z Engineering was selected to complete the construction inspection of Covington Trail (Phase III), located on the North side of Covington Road between Scott Road and Ladue Lane. The project required an INDOT certified inspectors and a Lead inspector experience with “Site Manager Program Software”. The work consisted of asphalt and concrete pavement, curbing, ADA curb ramps, and pedestrian crossings. Several drive approached needed reconstructed as a result of the trail placement. A&Z supervised all construction aspects of this project ensuring a quality product for the City of Fort Wayne.