
The Six Mile Creek Trail is a 10′ wide asphalt multi-use trail in a residential and commercial area of the city of Fort Wayne. It will connect to the existing Rivergreenway Trail System at Southtown Centre and at Moser Park and will provide the final link of a 26 mile loop. Phase I of the Six Mile Creek Trail will be one mile in length and will be designed and constructed first. This phase will run north along the west side of Anthony Boulevard from South Phoenix Parkway, across US 27/33 to the intersection of Tillman Road. From here the trail will travel east along the south side of Tillman Road to the intersection of Tillman and Lemar Drive. Parking and node amenities will be offered in this area.