Skip to Content

US 24 Small Structure Replacements and Repairs | Wabash County

Varying Treatments for Structures to Maximize Service Life

"Savings were greater than 20% of the approved budget. Scope received an above average level of performance as the designer reduced costs by utilizing the crossovers and ensured most desirable product was designed. Schedule is exceeds as Stage 1 was submitted 55 days early. The team provided an exceeds level of performance for responsiveness to my questions and requests."

INDOT Performance Evaluation Feedback | Des. 1900080